TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 1 HR8000 Floor Plate Automotive Lift 8,000 POUND CAPACITY
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 10 STEP 8: Use the existing holes in column base plate as a guide for drilling th
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 114-1/4”4-1/4”3-1/4”2-1/4”Drill holes using 3/4”carbide tippedmasonary drill bit
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 12Ø20 Washer3/4” -16UNF LockwasherØ20 WasherCable3/4” -16UNF LockwasherPulleyPull
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 13STEP 13: Cylinder centering and chain installation: Make sure the “Tip” on the
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 14STEP 15: Mount the Power Unit on lift as shown. STEP 16: Mount the Floor Plat
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 15Warning: – the wiring must comply with local code. Have a certified electrician
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 16Lift Lockout/Tagout Procedure Purpose This procedure establishes the minimum
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 17 Lift is not intended for outdoor use and has an operating ambient temperature
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 18 Ensure lift operators review safety and warning labels prior to operating lif
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 19Safety and Operating Instructions Only authorized personnel are to operate lift
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 2 TABLE OF CONTENTS • IMPORTANT INFORMATION...
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 20Refer to the manufacturer’s specific vehicle lifting points. Some vehicles dis
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 21 1. Check anchor bolts torque to 50 ft-lbs for the ¾ in. anchor bolts. Do not u
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 22TROUBLESHOOTING The common problems that may be encountered and their probable
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 23• Motor Hums and Will Not Run If the motor hums but fails to run, take the fo
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 24ILLUSTRATED PARTS BREAKDOWN 794439373817383977799
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 252122232177174421202787823 511123375302926272882712625191032576
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 2664565759586062196163415253 549 5565736972666768
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 27444481424181807146493047 484397
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 28 369426987 88 88 89 90 91 929395 HR8000 Parts list ITEM DRAWING DESCRIPTIO
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 2927 B40-8 Ø8 Lock Washer 4 28 B30-8 M8 Nut 6 29 30400-1013 Window Cover 2
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 3 CAUTION!! ENSURE THAT ALL CABLE SHEAVES, BEARINGS, AND SHAFTS ARE SUFFICIENT
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 3079 30400-9104L-2 CROSS CABLE 2 80 1WB-03 HYDRAULIC HOSE 1 81 30400-9054(B)Y
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 31NOTES
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 32NOTES
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 4LIFT SPECIFICATIONS FLOOR PLATE MODEL Capacity 8,000 lbs. (2,000 lbs per Arm)
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 5
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 6LIFT AREA LAYOUT INFORMATION FLOOR PLATE MODEL (Symmetrical Arm configuration)
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 7 FOUNDATION and ANCHORING REQUIREMENTS 1. Concrete shall have compression str
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 8 TOOLS & EQUIPMENT REQUIRED FOR INSTALL The installation of this lift is
TWO COLUMN 8K FLOOR PLATE LIFT CO7589 IN50014 Rev. D 03/2/2010 9 INSTALLATION PROCEDURE STEP 1: After unloading the lift, place it near the int
Komentarze do niniejszej Instrukcji